CITY OF EVERETT
2012 To 2017 Six-year Transportation Improvement Program
Projects in bold type not included in 2011-2016 TIP
Interstate
1. I-5 / Downtown Everett Interchange Access Improvements
(Everett Ave. Hewitt Ave., US 2, Pacific Ave.)
2. I-5 / 100th Street SE HOV Access/Undercrossing
3. NB Everett Mall Way / SB I-5 Onramp
4. I-5 / Smith Island Interchange (12th St. or SR 529)
5. I-5 / East Marine View Drive Interchange Improvements
6. I-5 HOV Lanes (US 2 to SR 528)
7. I-5 / 128th Street Interchange
8. I-5 / 128th Street HOV Ramps (Mariner PNR)
9. I-5 / 112th Street Interchange Study
Freeways
1. US 2 Improvements (I-5 to SR 204)
2. SR 526/ Hardeson Road Interchange
3. SR 526 Extension (I-5 to US 2)
4. SR 526/Evergreen Way Interchange
5. SR 529/Smith Island Ramps
6. SR 526/40th Avenue W. Intersection Improvements
Principal Arterials
1. W. Marine View Dr./Rucker/41st Freight Route Improvements
2. Broadway Bridge Replacement (Bridge #529/5a)
3. Broadway Corridor Improvements (SR 529 to SR 526)
4. SE Everett Mall Way (SR 99 to SR 526)
5. SR 99/Evergreen Way BRT Improvements. (128th to Pacific)
6. Arterial Safety Projects
7. Pacific Avenue/BNSF Grade Crossing Improvements
8. Evergreen Way Improvements (41st St. to Gibson Road)
9. I-5 to Port of Everett Truck Route
10. Mukilteo Blvd. Safety Imp. (Friday Ave. to City Limits)
11. Arterial Needs Study
Minor Arterials
1. 112th Street SW-SE Street Improvements (I-5 to SR 527)
2. 116th Street SE Street Improvements (SR 527 to 35th)
3. 100th Street SW Street Improv. (4th Ave. W. to Airport)
4. Casino Rd. Safety Improvements (Evergreen to 5th Ave.)
5. 4th Avenue West Improvements (104th to 112th)
6. 100th Street SE Improvements (SR 527 to 7th Ave SE)
7. 100th Street SE Improvements (7th Ave to Evergreen)
8. 110th Street SE Improvements (SR 527 to 35th St.)
9. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing
10. Minor Arterial Streetscape Improvements
Collector Arterials
1. East Everett Avenue/BNSF Overcrossing
2. Bond Street Ped/Bike Improvements. (Kromer to Terminal)
3. Chestnut St. /Eclipse Mill Road. Improvements (Pacific to 36th)
4. Silver Lake Road – 121st Street SE Ped. Improvements
5. 37th Street Improvements (Rucker to Broadway)
6. Collector Arterial Streetscape Improvements
Local Access and Other Projects
1. BNSF RR safety improvements
(Safety)
2. Local roadway safety projects
(Safety)
3. Safe routes to schools
(Safety)
Local Access and Other Projects (continued)
1. Bridge Rehabilitation Program
(Maintenance)
2. Annual Street Overlay Program
(Maintenance)
3. Sidewalk repair and replacement
(Maintenance)
4. Pavement marking projects
(Maintenance)
1. 106th Place SE Improvements
(Street)
2. 3rd Avenue SE Improvements
(Street)
3. Local Street Improvements
(Street)
4. Upper & Lower Ridge Rd. Improvements
(Street)
5. Riverfront Site Access Improvements
(Street)
6. Downtown Streetscape Improvements (Street)
1. Traffic Signal Central Control Repl. (Traffic Signals)
2. Traffic Signal Interconnect
(Traffic Signals)
3. Traffic Signal Improvements
(Traffic Signals)
4. Traffic Sign Improvements
(Traffic Signals)
1. Neighborhood Block Grants
(Neighborhoods)
2. Neighborhood Traffic Studies/Proj. (Neighborhoods)
3. Residential Sidewalks
(Neighborhoods)
Non-Motorized Trail/Path Improvements
1. Riverfront Walkway Phase II
2. East Grand Walkway Connection
3. Henry M. Jackson Ped. Bridge
4. 36th St. (or vicinity)/BNSF Rail Line Ped/Bike Crossing
5. Smith Island Bike and Pedestrian Improvements
6. Bicycle Master Plan Implementation
7. Riverside Bus Pk. Ped. Trail (16th to N. Broadway)
8. West/East Marine View Drive Bike-Ped Improvements
9. 47th Street Ped Improvements (Evergreen to Black Forest Lane)
10. Pigeon Creek No. 1/BNSF Rail Line Crossing
11. Grand Avenue/North Marina Ped-Bike Connection
12. Shoreline Access Imp. (Various Locations)
13. Snohomish River Bike/Pedestrian Bridge Evaluation
14. Pigeon Creek Rd. No. 1 Improvements
15. Everett Non-motorized Projects (Various Locations in Everett)
16. Lowell Snohomish River Road. Bike/Ped Connection
17. Riverfront District Bike/Ped Paths
18. Interurban Trail Bike/Ped Path Improvements
19. Bicycle Detection Signals
20. ADA Signals
21. ADA Ramps
Transit
1. Bus Replacements – 2012 to 2017
2. Implementation of State CTR Law
3. SE Everett Terminal (Station)
4. Midtown Transit Center
5. Everett Station Repair and Updates
6. Base Relocation
7. Transit Voice Communications Update
8. Transit Priority Equipment
9. Riverfront to Harborfront Connector
HOV Projects
1. Everett Station Park & Ride Parking Structure

CITY OF EVERETT 2012 TO 2017 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Project
PROJECT
PRIO-
PE
R/W
CONST.
Est. 2012-17
LEAD
MAP
Number
TYPE
RITY
PROJECT NAME
TERMINI
START
START
START
Expenditures
AGENCY
NO.
1
Interstate
1
I-5 Downtown interchange improvements
Pacific, Everett, Hewitt Aves., and US 2
Jan. 12
Jun.13
Sep.14
28,500,000 *
EVERETT
1
2
Interstate
2
I-5/100th Street SE HOV Access/Undercrossing
I-5 at 100th Street SE
Jul.13
Jan.14
Jan.15
68,500,000 *
EVERETT
2
3
Interstate
3
NB Everett Mall Way to SB I-5 Onramp
Everett Mall Way to southbound I-5
Jan.12
May.13
3,500,000 *
WSDOT
3
4
Interstate
4
I-5 / Smith Island interchange
12th Ave. NE or SR 529
Jan.12
Jun.13
Jul.14
10,000,000 *
EVERETT
4
5
Interstate
5
I-5 / East Marine View Drive Interchange
I-5 at East Marine View Drive
Jan.12
Jun.13
Jun.14
16,000,000 *
EVERETT
5
6
Interstate
6
I-5 HOV Lanes
US 2 to SR 528
Jan.13
Jun.17
May. 19
5,000,000 *
WSDOT
6
7
Interstate
7
I-5 / 128th Street Interchange
I-5 at 128th Street
Jan. 13
Jan.19
May. 21
2,000,000 *
WSDOT
7
8
Interstate
8
I-5 / 128th Street HOV Ramps (Mariner PNR)
I-5 at 128th Street / Mariner PNR
Jan. 12
Jan.14
May. 16
6,000,000 *
WSDOT
8
9
Interstate
9
I-5 / 112th Street Interchange Study
I-5 at 112th Street SE
Jan.14
3,000,000 *
WSDOT
9
10
Freeway
1
US 2 Improvements
I-5 to SR 204
Jun.13
Jun.15
Jun.16
3,000,000 *
WSDOT
10
11
Freeway
2
SR 526/Hardeson Road Interchange
SR 526 at Hardeson Road
Jun. 13
Jun. 15
Jun. 17
2,000,000 *
WSDOT
11
12
Freeway
3
SR 526 Extension Study
SR 526 to US 2
Jun.12
8,500,000 *
WSDOT
12
13
Freeway
4
SR 526/Evergreen Way Interchange
SR 526 at Evergreen Way
Jun. 13
Jun. 15
Jun. 17
38,000,000 *
WSDOT
13
14
Freeway
5
SR 526/40th Avenue West Intersection
SR 526 and 40th Avenue West
Jun. 13
Jun. 15
Jun. 16
500,000 *
EVERETT
14
15
Freeway
6
SR 529/Smith Island Ramps
SR 529 at Smith Island
Jun. 13
Jun. 15
Jun. 17
250,000 *
WSDOT
15
16
Principal Arterial
1
W. Marine View Dr./Rucker Ave./41st St. Freight Route
W. Marine View Dr., Rucker Ave, 41st Street
Sep.11
Jun.12
Jun.13
4,280,000 *
EVERETT
16
17
Principal Arterial
2
Broadway Bridge Replacement (#529/5a)
Hewitt Ave. to California Ave.
Mar.10
Jul.11
Mar. 12
7,300,000 *
EVERETT
17
18
Principal Arterial
3
Broadway Corridor Improvements
SR 526 to SR 529
Feb.12
Feb.13
Jun.14
4,000,000 *
EVERETT
18
19
Principal Arterial
4
SE Everett Mall Way
SR 99 to SR 526
Feb.12
Feb.13
Jun.14
1,000,000 *
EVERETT
19
20
Principal Arterial
5
SR 99/Evergreen Way Bus Rapid Transit Corridor
128th Street to Everett Station
May.08
Jan. 09
2,150,000 *
EVERETT
20
21
Principal Arterial
6
Arterial Safety Projects (Forest Pk entrances; I-5 and Pacific)
Various Locations
Jan.12
Mar.13
900,000 *
EVERETT
22
Principal Arterial
7
Pacific Avenue/BNSF Grade Crossing Improvements
Pacific Avenue and Chestnut St.
Jan.11
Jun.12
Jun.14
6,000,000 *
EVERETT
21
23
Principal Arterial
8
Evergreen Way Improvements, 41st to Airport Road
41st to Airport Road
Jan.11
Jul.13
1,000,000 *
EVERETT
22
24
Principal Arterial
9
Interstate 5 to Port of Everett Truck Route Plan
Port of Everett to I-5
Jan. 11
200,000 *
EVERETT
25
Principal Arterial
10
Mukilteo Blvd. Safety Improvements
Friday Avenue to city limits
Feb.12
Apr.13
3,300,000 *
EVERETT
23
26
Principal Arterial
11
Arterial Needs Study
Various arterials within city limits
Feb.12
200,000 *
EVERETT
27
Minor Arterial
1
112th Street SE Improvements
Interstate 5 to 19th Avenue SE
Jun.07
Apr.09
Jul.10
4,650,000 *
EVERETT
24
28
Minor Arterial
2
116th Street SE Improvements
SR 527 to 35th Street SE
Jan.10
Jul.11
May.12
3,800,000 *
EVERETT
25
29
Minor Arterial
3
100th Street SW Improvements
Airport Road to 4th Avenue West
Feb.12
Jan.13
Jun.14
3,600,000 *
EVERETT
26
30
Minor Arterial
4
Casino Road at 5th Ave. W. Road Intersection Improvements
Casino Road at Hardeson Road
Mar.11
Mar.12
May.13
500,000 *
EVERETT
27
31
Minor Arterial
5
4th Avenue West Widening and Improvement
104th Street to 112th St. SW
Jan.11
Jan.12
May.13
9,000,000 *
SNO. CNTY.
28
32
Minor Arterial
6
100th Street SE Improvements
SR 527 to 7th Avenue SE
Jan.14
Jan.16
May.18
1,000,000 *
EVERETT
29
33
Minor Arterial
7
100th Street SE Improvements
7th Avenue SE to Evergreen Way
Jan.14
Jan.16
May.18
1,000,000 *
EVERETT
30
34
Minor Arterial
8
110th Street SE Improvements
SR 527 to 35th Street SE
Jan. 11
Jan. 13
May.15
2,000,000 *
EVERETT
31
35
Minor Arterial
9
Lenora St./BNSF Rail Line Overcrossing
Lenora St. & Lowell Sno. River Rd.
Jul.11
Jul.13
May 15
1,800,000 *
EVERETT
32
36
Minor Arterial
10
Minor Arterial Expansions and Streetscaping
Various Locations
Jan. 12
Jan. 13
May.15
400,000 *
EVERETT
37
Collector Arterial
1
East Everett Ave./ BNSF Overcrossing
East Grand Ave. to Railway Ave.
Jan.12
Sep.13
Jun.14
7,000,000 *
EVERETT
33
39
Collector Arterial
2
Bond Street Ped/Bike Improvements
Kromer to Terminal Ave.
Jun.03
Jan.04
Jul.08
100,000 *
EVERETT
34
40
Collector Arterial
3
Chestnut St./Eclipse Mill Rd. Improvements
Pacific Ave. to 36th Street
Jan.10
Jun.11
3,350,000 *
EVERETT
35
41
Collector Arterial
4
Silver Lake Road-121st St. SE Ped. Improv.
112th Street to SR 527
Jun.10
Jun.11
Jul.12
1,500,000 *
EVERETT
36
44
Collector Arterial
5
37th Street improvements and traffic signal
Rucker Avenue to Wetmore Ave.
Jun.10
Jun.11
500,000 *
EVERETT
37
45
Collector Arterial
6
Collector Arterial Streetscape Improvements
Various Locations
Jan.12
Jun.13
Jul.14
400,000 *
EVERETT
265,680,000
* A portion or all of the funding for this project has not yet been committed.
NOTE: Projects shown in bold type were not included in the 2011-2016 Six-Year TIP.

CITY OF EVERETT 2012 TO 2017 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Project
PROJECT
PRIO-
PE
R/W
CONST.
Est. 2012-17
LEAD
MAP
Number
TYPE
RITY
PROJECT NAME
TERMINI
START
START
START
Expenditures
AGENCY
NO.
46
Local Access-SAF
1
BNSF RR safety improvements
Various locations
Jan.12
Jun.12
600,000 * EVERETT
47
Local Access-SAF
2
Local Roadway Safety Projects
Various locations
Jan.12
Jun.12
120,000 * EVERETT
48
Local Access-SAF
3
Safe Routes to Schools
Various locations
Jan.12
Apr.10
600,000 * EVERETT
49
Local Access-PR/M
1
Bridge Rehabilitation Program
Various locations
Jan.12
Jul.12
3,000,000 * EVERETT
50
Local Access-PR/M
2
Annual Street Overlay Program
Various streets
Jan.12
Jul.12
6,000,000 * EVERETT
51
Local Access-PR/M
3
Sidewalk repair and replacement
Various locations
Jan.12
May 12
360,000 * EVERETT
52
Local Access-PR/M
4
Pavement Marking Project
Various locations
Jan.12
May 12
210,000 * EVERETT
53
Local Access-STR
1
106th Place SE Improvements
16th Avenue SE to 19th Avenue SE
Nov.10
Jun.11
650,000 * EVERETT
38
54
Local Access-STR
2
3rd Avenue SE Street Improvements
92nd Street SE to 95th Street SE
Jan.11
Apr.12
675,000 * EVERETT
39
55
Local Access-STR
3
Local Street Improvements
Various locations
Jul.11
May 12
580,000 * EVERETT
56
Local Access-STR
4
Upper & Lower Ridge Rd. Str. Improv.
74th Street to 78th Street
Aug.12
Jun.13
300,000 * EVERETT
40
57
Local Access-STR
5
Simpson Site Access Improvements
Simpson Site, Snohomish Riverfront
Aug.12
Jun.10
2,000,000 * EVERETT
41
58
Local Access-STR
6
Downtown Streetscape Improvements
Various locations in the Central Business District
Jul.09
Jan. 10
Apr. 10
8,000,000 * EVERETT
42
59
Local Access-SIG
1
Traffic Signal Central Controller Replacement
Various locations
Jan.12
Jul.12
600,000 * EVERETT
60
Local Access-SIG
2
Traffic Signal Interconnect
Various locations
Jan. 12
May.12
240,000 * EVERETT
61
Local Access-SIG
3
Traffic Signal Improvements
Various locations
Jan.12
Jun.12
900,000 * EVERETT
62
Local Access-SIG
4
Traffic Sign Improvements
Various locations
Jan.12
Jun.12
500,000 * EVERETT
63
Local Access-NEI
1
Neighborhood Block Grants
Various locations
Jan.12
May.12
360,000 * EVERETT
64
Local Access-NEI
2
Neighb. Traffic Mitigation Studies & Projects
Various locations
Jan.12
May.12
2,400,000 * EVERETT
65
Local Access-NEI
3
Residential Sidewalks
Various locations
Jan.12
May.12
2,400,000 * EVERETT
66
Local Access-NM
1
Riverfront Walkway Phase II
41st Street to Smith Street
May 08
May.12
55,000 * EVERETT
43
67
Local Access-NM
2
East Grand Walkway Connection
East Grand and I-5
Jan. 10
Jul 11
850,000 * EVERETT
44
68
Local Access-NM
3
Henry Jackson Park Ped Bridge
E. Marine View Drive to Riverside Bus. Park
Jan.07
May.10
Jul.11
2,700,000 * EVERETT
45
69
Local Access-NM
4
36th Street/BNSF Rail Line Ped/Bike Crossing
36th & BNSF Rail Line
Jan.08
Nov.08
Jun.14
2,800,000 * EVERETT
46
70
Local Access-NM
5
Smith Island Bike/Ped improvements
Various arterials on Smith Island
Jan.10
Jan.11
May 12
1,000,000 * EVERETT
47
71
Local Access-NM
6
Bicycle Master Plan Implementatio
Various locations
Jan.12
Aug.12
200,000 * EVERETT
72
Local Access-NM
7
Riverside Business Park Ped trail
Snohomish River at Riverside Business Park
Apr.09
Apr.10
700,000 * EVERETT
48
73
Local Access-NM
8
West/East Marine View Drive Bike-Ped Improvements
Alverson Bridge to North Broadway
Aug.09
Apr.11
500,000 * EVERETT
49
74
Local Access-NM
9
47th Street Pedestrian Improvements
Evergreen Way to Black Forest Lane
Jan.11
Jun.12
500,000 * EVERETT
50
75
Local Access-NM
10
Pigeon Creek No. 1/BNSF Crossing
Port of Everett Public Access Walkway to Pigeon Crk Rd
Jan. 10
Jul. 11
Apr. 12
925,000 * EVERETT
51
76
Local Access-NM
11
Grand Ave./N. Marina Ped-Bike Connection
Grand Ave. to W. Marine View Drive
Jan. 12
Jan.13
May.14
1,050,000 * EVERETT
77
Local Access-NM
12
Shoreline Access Improvements
Various locations
Apr.12
Apr.13
2,400,000 * EVERETT
78
Local Access-NM
13
Snohomish River Bike and Ped. Bridge
E. Marine View Drive to Smith Island
Nov.01
Apr.12
9,000,000 * EVERETT
52
79
Local Access-NM
14
Pigeon Creek Road No. 1 Improvements
Mukilteo Blvd to BNSF R/W
Apr.12
Apr.14
1,000,000 * EVERETT
53
80
Local Access-NM
15
Lowell Snohomish River Rd. Bike/Ped Connection
Rotary Park to city limits
May.11
Aug.12
Sep.13
1,500,000 * EVERETT
54
81
Local Access-NM
16
Everett Non-Motorized Projects **
Various locations
May.12
Aug.10
Sep.11
760,000 * EVERETT
82
Local Access-NM
17
Riverfront District Bike/Ped Paths
Various locations in Riverfront District
Jul. 09
Jul. 11
500,000 * EVERETT
83
Local Access-NM
18
Interurban Trail Bike/Ped Path Improvements
Various locations on Interurban Trail
Jul. 10
Jul. 12
500,000 *
EVERETT
84
Local Access-NM
19
Bicycle Detection Signal
Various locations
Jan.12
Jul. 12
200,000 *
EVERETT
85
Local Access-NM
20
ADA Signals
Various locations
Jan.12
Jul. 12
200,000 *
EVERETT
86
Local Access-NM
21
ADA Ramps
Various locations
Jan.12
Jul. 12
200,000 *
EVERETT
**Candidate non-motorized improvements include Norton Avenue, Olympic Drive, Smith Avenue, Wall Street,
58,035,782
Lowell River Road, 36th Street, Sharon Drive, Friday Avenue, Lowell Road-Lenora Street, 90th Street SW,
93rd Street SW, Dorn Avenue-92nd Street SE, 7th Avenue SE, 3rd Avenue SE, Dakota Way, Hollowdale Place, Cady Road,
Fleming Street, 75th Street, 100th Street SW, and Shore Avenue/Edgewater Beach and various shoreline public access projects
* A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2011-2016 Six-year TIP.
Local Access Codes: SAF = Safety; PR/M = Preservation and Maintenance; STR = Street construction; SIG = Traffic Signal Improvement;
NEI = Neighborhood Projects; LS = Landscaping Project; NM = Non-Motorized Improvement

PROJECT
PRIO-
PE
R/W
CONST.
Est. 2012-17
LEAD
MAP
TYPE
RITY
PROJECT NAME
PROJECT LOCATION START
START
START
Expenditures
AGENCY
NO.
Transit Projects
Bus Replacements 2011 Approx. 4 PT Buses
Jun. 11
480,000 Everett Transit
Transit Projects
Bus Replacements 2011 Approx. 5 HD Buses
Jun. 11
2,750,000 Everett Transit
Transit Projects
Bus Replacements 2012 Approx. 5 PT Buses
Jun. 12
600,000 Everett Transit
Transit Projects
Bus Replacements 2013 Approx. 7 HD Buses
Jun. 13
4,550,000 Everett Transit
Transit Projects
Bus Replacements 2014 Approx. 4 HD Buses
Jun. 14
2,600,000 Everett Transit
Transit Projects
Bus Replacements 2015 Approx. 6 HD Buses
Jun. 15
3,900,000 Everett Transit
Transit Projects
Bus Replacements 2016 Approx. 4 HD Buses
Jun. 16
2,600,000 Everett Transit
Transit Projects
Bus Replacements 2016 Approx. 3 PT Buses
Jun. 16
360,000 Everett Transit
Transit Projects
Bus Replacements 2017 Approx. 3 HD Buses
Jun. 17
1,950,000 Everett Transit
Transit Projects
Implementation of State CTR Law
Jul. 12
Jun. 14
300,000 Everett Transit
Transit Projects
SE Everett Terminal (Station)
Jun. 15
Jun. 16
3,000,000 Everett Transit
Transit Projects
Mid-Town Transit Center
Aug. 14
Jun.15
6,000,000 Everett Transit
Transit Projects
Everett Station Repair and Updates
Everett Station
Jun. 11
Jun.18
1,000,000 Everett Transit
Transit Projects
Base Relocation
Aug. 12
Jun.15
25,000,000 Everett Transit
Transit Projects
Transit Voice Communications Update
Jan. 11
Jun. 12
300,000 Everett Transit
Transit Projects
Transit Priority Equipment
Jan. 09
Jun. 11
625,000 Everett Transit
Transit Projects
Riverfront to Harborfront Connector (Bus)
Jan. 12
May 15
5,000,000 Everett Transit
HOV Projects
Everett Station Park & Ride Parking Structure
Everett Station
Jan. 13
May 15
21,500,000 Everett Transit
82,515,000
CITY OF EVERETT 2012 TO 2017 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM

TIP 2012-2017 Map # 1

TIP 2012-2017 Map # 2

TIP 2012-2017 Map # 3

TIP 2012-2017 Map # 4

TIP 2012-2017 Map # 5

TIP 2012-2017 Map # 6

TIP 2012-2017 Map # 7

TIP 2012-2017 Map # 8

TIP 2012-2017 Map # 9

TIP 2012-2017 Map # 10

TIP 2012-2017 Map # 11

TIP 2012-2017 Map # 12

TIP 2012-2017 Map # 13

TIP 2012-2017 Map # 14

TIP 2012-2017 Map # 15

TIP 2012-2017 Map # 16

TIP 2012-2017 Map # 17

TIP 2012-2017 Map # 18

TIP 2012-2017 Map # 19

TIP 2012-2017 Map # 20

TIP 2012-2017 Map # 21

TIP 2012-2017 Map # 22

TIP 2012-2017 Map # 23

TIP 2012-2017 Map # 24

TIP 2012-2017 Map # 25

TIP 2012-2017 Map # 26

TIP 2012-2017 Map # 27

TIP 2012-2017 Map # 28

TIP 2012-2017 Map # 29

TIP 2012-2017 Map # 30

TIP 2012-2017 Map # 31

TIP 2012-2017 Map # 32

TIP 2012-2017 Map # 33

TIP 2012-2017 Map # 34

TIP 2012-2017 Map # 35

TIP 2012-2017 Map # 36

TIP 2012-2017 Map # 37

TIP 2012-2017 Map # 38

TIP 2012-2017 Map # 39

TIP 2012-2017 Map # 40

TIP 2012-2017 Map # 41

TIP 2012-2017 Map # 42

TIP 2012-2017 Map # 43

TIP 2012-2017 Map # 44

TIP 2012-2017 Map # 45

TIP 2012-2017 Map # 46

TIP 2012-2017 Map # 47

TIP 2012-2017 Map # 48

TIP 2012-2017 Map # 49

TIP 2012-2017 Map # 50

TIP 2012-2017 Map # 51

TIP 2012-2017 Map # 52

TIP 2012-2017 Map # 53

TIP 2012-2017 Map # 54